Recognition Schedule Audit
Check that a revenue recognition schedule sums to its contract value exactly and covers its term with no gap or overlap. A cent either way means that amount is either never recognised or recognised without having been contracted, and both are reported with the exact figure. Periods are treated as inclusive day ranges, so the day after one ends is the day the next must begin, and a gap and an overlap are separate findings because they are opposite errors.
Listing completeness · 80/100
Presence of published information only. Not a security, reliability or performance score. Same rules for Datoka and external listings.
- Name and traceable source
- 10/10 · Present
- Meaningful description
- 10/10 · Present
- Connection or installation reference
- 20/20 · Present
- Dedicated documentation or source repository
- 0/15 · Missing or insufficient
- Explicit free access or numeric tariff
- 20/20 · Present
- Declared integration protocol
- 10/10 · Present
- Source updated within 90 days
- 10/10 · Present
- Declared capability names
- 0/5 · Missing or insufficient
Evaluated 2026-10-08 · Method listing-completeness-1. Scoring rules
Connect & use
Connect through the publisher’s supported interface. Any credentials or payments are handled by the provider.
x402 resource
https://api.zfinia.com/x402/v1/revenue-recognition-schedule-auditRead the current payment requirements with a compatible client before authorizing a call.
Categories and declared capabilities
Topic categories are derived from publisher text for discovery, not independently verified capabilities.
The registry does not provide a verified tools list. See the observations, when available, for any tools/list check; a published tools list does not establish that execution succeeds.
Evidence, with its limits.
This listing is indexed. Any domain claim or endpoint observation appears separately with its date and limited scope. No payment execution, factual accuracy or safety certification is inferred.